Gas Pipeline

Using ultra modern equipment and materials and construction materials, Rapid Bild has imposed itself as a leader in the performance of the National gas pipeline in the Republic of Macedonia. The uniqueness of these projects is the fact that for the first time a Macedonian company is the carrier of the construction works of a National gas pipeline with high pressure. In addition, it is good to know that we have accomplished the first procurement and usage of automatic welding machines (orbital welding heads) at the territory of the Republic of Macedonia which enabled the completion of the installation-welding works of the project within the due time limit. Also for the first time RAPID BILD DOO applied quality polyethylene isolation for the isolation of the welded joints allowing longer durability and exploitation period of the gas pipeline.

The services

Rapid Bild takes pride in several similar important projects that the company has completed:

  • National gas pipeline section Klechovce – Block station 5
  • National gas pipeline section BS5 – Negotino with Main Measuring Regulation Station (MMRS) Shtip and MMRS Negotino
  • National gas pipeline section Skopje – Tetovo - Gostivar
  • National gas pipeline section Negotino (Kavadarci) - Bitola

Get an offer for collaboration